Technical feasibility is paramount. So if the team reports the project is not overall viable, that's a successful outcome, too. Larry Desjardin explains.
Mentor Graphics has broken with the mould in announcing a 5-year roadmap for the VeloceStratoM platform, which holds 64 verification boards and consumes 22.7W/Mgate when fully loaded.
The digital isolators reduce required PCB space as well as component cost and design complexity as multiple diodes and resistors are no longer needed. read on »